The Drill Rig navigates through the narrow Puffertgaessli:
Then arrives the truck with all the necessary
stuff:
And slowly slowly backwards through Surbekstrasse
the compressor observed by interested spectators:
Unloading Stuff:
And more Stuff:
Positioning of the Geothermal Drilling Rig:
Precision Positioning:
And at end of Day Zero the Rig is ready to drill
-- tomorrow Wednesday is Day 1:
|